TIMELINE AND IMPACT
- Start date
- Project completed September 2025
- Temporary lane closures anticipated for West Edgewood crosswalk renovation
BUDGET
- Projected Cost: $386,661.00 ($1,4717,066.69)
- Funding Source:
- Contractor: Don Schnieders Excavating Company
SCOPE OF WORK
- A 10-foot-wide concrete trail along the Frog Hollow Branch of Wears Creek from Cavalier Drive to W. Edgewood Drive and a crosswalk at W. Edgewood Drive, including concrete trail and sidewalk, curb and gutter, streambank stabilization, stormwater structures and piping, retaining walls, pedestrian warning lights, signage, striping and other ancillary construction. The project will also include the construction of a sanitary relief sewer along the majority of the trail including 18” and 24” pipe and associated manhole structures.